High temperature application pipe P21 P22 P91 P92 alloy seamless pipe for carbon steel pipe

Basic InfoModel NO.EZSProductBearing Steel Tubes Seamless Pipe Water PipeStandardASTM A179, En10216-2, ASTM A213, ASTM A249/A269Grade304, 304L, 316, 316L, P5, P9, P11, P22 etcSurface ConditionOiled, Pickled, Passivated, PolishingDelivery ConditionAnnealed, Normalized, N+TemperedCoatingBlack/Varnish/OilingEnd TypePlain End, Bevel

Featured Products

Basic Info


Model NO.
EZS
Product
Bearing Steel Tubes Seamless Pipe Water Pipe
Standard
ASTM A179, En10216-2, ASTM A213, ASTM A249/A269
Grade
304, 304L, 316, 316L, P5, P9, P11, P22 etc
Surface Condition
Oiled, Pickled, Passivated, Polishing
Delivery Condition
Annealed, Normalized, N+Tempered
Coating
Black/Varnish/Oiling
End Type
Plain End, Bevel End
Delivery Time
15-60 Days
Application1
Heat Exchanger, Boiler,Condenser Tube
Application2
Hydraulic Tubes & Instrumentation Tubes
Mill Test
NDT Test( X-ray Test, U.T, E.T ), Hydraulic Test.
Shipment Method
by Container, LCL Cargo or Break Bulk Vessel
Trade Term
Fob, CFR, CIF, DDP, DAP
Certificate
SGS, BV, TUV etc
Trademark
EZS
Transport Package
Bundled, Plywood Wooden Case, Water Proof Package
Specification
15-219 mm
Origin
China
HS Code
7304

Product Description

Customer Question & Answer

Product NameSeamless Carbon Steel, Stainless Steel MS Tubing/Tube/Pipe for Boiler, Heat Exchanger, Paper Making, Water, Gas Pipeline(SA179/192/A210, EN10216, DIN17175)
Production Standards & MaterialsAPI 5L/ASTM A106/A53 Grade A,B,C,D
ASTM SA179/178/SA192
EN10216-1 P195TR1/TR2, P235TR1/TR2, P265TR1/TR2
EN10216-2 195GH,P235GH,P265GH,TC1,TC2
DIN17175 ST35.8, ST45.8
JIS G3454 STPG370, STPG410
JIS G3461 STB340, STB410, STB440
Outside Diameter Ranges15mm-219mm
Wall Thickness Ranges1mm-15mm
Length (negotiable)5.8m
6m,12m,14m
As per request
Pipe TypeCold Drawn
Pipe End1> 8-60mm Plain End;
2> 60-168.3mm Plain End or Beveled End
End protector1> Plastic pipe cap; 
2> Steel Socket
PackingSeaworthy packing(bundled according to the different size),
with plastic bags or plywood box.
Out Surface TreatmentBared, Black Painted, Varnish, Oil-dip, Passivation, Phosphating, Shot blasting
InspectionWith Hydraulic Testing, Eddy Current, Infrared Test
ApplicationLow-Pressure Liquid, Water, Gas, Oil, Line Pipe, Heat-Transfer Equipment,
such as tubular heat exchanger, condenser and superheater, For high, middle,
low-pressure boiler and pressure purpose
Our advantages·Diverse products(Steel pipes, pipe fittings)
·Any third party inspection can be accepted
·Quick response for quotation, delivery, after-service.
·Focus on pipe & tube solution for project application.
  
 
 
ezsteel.en.made-in-china.com

Seamless Carbon Steel, Stainless Steel Ms Tubing/Tube/Pipe for Boiler, Heat Exchanger, Paper Making, Water, Gas Pipeline (SA179/192/A210, EN10216, DIN17175)
Seamless Carbon Steel, Stainless Steel Ms Tubing/Tube/Pipe for Boiler, Heat Exchanger, Paper Making, Water, Gas Pipeline (SA179/192/A210, EN10216, DIN17175)
Seamless Carbon Steel, Stainless Steel Ms Tubing/Tube/Pipe for Boiler, Heat Exchanger, Paper Making, Water, Gas Pipeline (SA179/192/A210, EN10216, DIN17175)
Seamless Carbon Steel, Stainless Steel Ms Tubing/Tube/Pipe for Boiler, Heat Exchanger, Paper Making, Water, Gas Pipeline (SA179/192/A210, EN10216, DIN17175)
Seamless Carbon Steel, Stainless Steel Ms Tubing/Tube/Pipe for Boiler, Heat Exchanger, Paper Making, Water, Gas Pipeline (SA179/192/A210, EN10216, DIN17175)
Seamless Carbon Steel, Stainless Steel Ms Tubing/Tube/Pipe for Boiler, Heat Exchanger, Paper Making, Water, Gas Pipeline (SA179/192/A210, EN10216, DIN17175)
Seamless Carbon Steel, Stainless Steel Ms Tubing/Tube/Pipe for Boiler, Heat Exchanger, Paper Making, Water, Gas Pipeline (SA179/192/A210, EN10216, DIN17175)
Seamless Carbon Steel, Stainless Steel Ms Tubing/Tube/Pipe for Boiler, Heat Exchanger, Paper Making, Water, Gas Pipeline (SA179/192/A210, EN10216, DIN17175)




Seamless Carbon Steel, Stainless Steel Ms Tubing/Tube/Pipe for Boiler, Heat Exchanger, Paper Making, Water, Gas Pipeline (SA179/192/A210, EN10216, DIN17175)
Alloy Seamless for High Temperature Application Tube P21 P22 P91 P92 Carbon Steel Pipe

FAQ

Q:  How many days can you deliver after confirmed the order?
A:  For stock:  within 5-7 days;
      For customized product:  around 30 days;
      For special sizes:  subject to negotiation.

Q: How does your company do quality control?
A: ISO 9001:2015 certified;
     Product certificate as per EN10204 3.1 or 3.2 as per customer's request.
  
Q: Can I have a factory-visit?
A:  Surely. All customers are welcome to visit us in China.

Q: Can I have a trial order?
A: Of course, it is an honor for us to have the opportunity to show our quality and service.
 

Contact us

Please feel free to give your inquiry in the form below We will reply you in 24 hours